Residual risk in building development
The development of buildings is carried out in several phases, all involving hazard, uncertainty and risk. Risks which may occur on construction projects can sometimes be designed out or avoided. Remaining risks may be:
- Transferred to the contractor.
- Shared by the employer and contractor.
- Retained by the employer.
According to NRM2: Detailed measurement for building works, the term ‘residual risk’, or ‘retained risk’ refers to risks retained by the employer, that is, unexpected expenditure arising from risks that materialise, which are retained by the employer rather than being transferred to the contractor.
The employer may ask the contractor to provide a price for taking on a risk themselves before deciding to retain a risk.
Residual risks retained and managed by the employer or their project team are described as the employer’s residual risk exposure. Risk allowances should be included in cost plan to provide for this exposure.
Government Functional Standard, GovS 002: Project delivery; portfolio, programme and project management, Version: 2.0, published on 15 July 2021 by HM Government, defines a residual risk as: ‘The risk remaining after the risk response has been applied.’
[edit] Related articles on Designing Buildings
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.